Disposal scheme of EMU top-climbing during operation
-
摘要: 分析研究高铁动车组在运行途中发生需登顶处置的作业流程,提出改进的处置方案。该方案从动车组放电方式、安全信息确认和工具备品准备等方面进行了流程优化。经现场演练验证,优化后的方案在保证随车机械师人身安全的前提下,显著提高了登顶应急处置效率。Abstract: This article analyzed and studied the process of top-climbing disposal of high-speed railway EMU during operation, and put forward an improved disposal scheme. The scheme optimized the discharge mode of EMU, the confirmation of safety information and the preparation of products. The field drill validates that the optimized scheme significantly improves the efficiency of emergency disposal of top-climbing on the premise of guaranteeing the personal safety of the mechanics on board.
-
Keywords:
- EMU /
- top-climbing /
- personal safety /
- efficiency of emergency disposal
-
-
[1] 孟川舒,何书堂,胡召华,等. 铁路局应急平台总体设计及关键技术[J]. 铁路计算机应用, 2014, 23(4):1-4. [2] 刘健,孟学雷,王金霞. 突发事件下的列车运行图稳定性分析[J]. 铁路计算机应用, 2015, 24(9):1-5. [3] 陈光辉. 动车组"弓网故障"应急处理存在的六个薄弱环节及建议议[C]//郑州铁路局"十百千"人才培育助推工程论文集, 2011. [4] 马升潘,李兵,贾步超,等. CRH2型动车组车顶高压系统残存电荷放电研究[J]. 铁道车辆, 2018, 56(5):14-16. [5] 王琦. CRH2型动车组受电弓故障应急处置方案探讨[J]. 上海铁道科技, 2016(2):46, 60. [6] 张荣佳,刘春海,刘玉铃,等. CRH3型动车组高压放电分析与研究[J]. 铁道车辆, 2018, 56(12):4, 9 -13.
[7] 钱宏竞. 调度命令安全风险控制[J]. 数字通信世界, 2017(10):255, 282. [8] 田孝伯."挂接地线"中保障人身安全的措施[J]. 电力建设, 1997(6):60-63.
计量
- 文章访问数: 49
- HTML全文浏览量: 0
- PDF下载量: 12