Abstract:
This paper focused on the integrated management of comprehensive maintenance and production of high-speed railway, and took the Building Information Model (BIM) as the carrier, used data-driven to implement the connection between project construction and operation and maintenance management, accessed detection and monitoring data, designed comprehensive maintenance and production management information system based on BIM. The system took Beijing-Zhangjiakou high-speed railway as a pilot, carried out beneficial exploration and practice in order to implement the whole life cycle management of infrastructure and improve the level of operation and maintenance management.