Abstract:
Based on the analyzing the integration demands of construction management of Shenshuo railway, this paper proposed the whole process integrated framework of construction safety management of Shenshuo railway business line, built the construction management information system of Shenshuo railway business line by using Oracle RAC database system, configuring the Weblogic application server and using JAVA as software development and operation platform. The architecture design, database design, and function design of the system were introduced. The system was applied in Shenshuo railway, could meet the construction management requirements, reduced the workload, and improved the efficiency of work and management.