• 查询稿件
  • 获取最新论文
  • 知晓行业信息

列控工程数据自动审核的研究与实现

Automatic data auditing for train control engineering

  • 摘要: 列控工程数据表(以下简称列控数据表)所提供的数据作为CTCS-2级和CTCS-3级列控系统配置数据的基础,其正确性直接影响整个列控系统的安全性,因此,列控数据的审核工作非常重要。近年来,随着我国高速铁路事业的迅速发展,列控数据的审核工作也随之变得更加繁重和艰巨。本文在分析现有列控数据审核技术的基础上,开发和设计出一种对列控数据的自动审核工具。

     

    Abstract: The correctness of the data, provided by the Train Control Engineering Data sheet, the foundation of the configuration data of CTCS-2 and CTCS-3, affected directly the security of Train Control System. Therefore, the auditing of the data played a great role of importance. In recent years, with the development of China high-speed railway, the auditing work became more arduous and onerous. The existing train control data auditing techniques was discussed in this paper, so as to design and develop a tool of automatic train control data auditing.

     

/

返回文章
返回