Abstract:
Based on analyzing existing shortcoming of the system integration test for urban rail transit, combined with the current situation of the test implementation, This article proposed the new technical scheme of system integration test for urban rail transit: design the content of integration test for urban rail transit, establish the organization management mode of the test. This scheme was with positive significance to improve the construction management level and the system integration test management ability for the urban rail transit of our country.