[1] |
吴 卫.风险评估技术在铁路信号系统中的应用[J].自动化与仪器仪表,2012(2):122-124. Wu Wei.Risk assessment techniques used in railway signal system[J] .Automation and Instrumentation,2012(2) :122-124.
|
[2] |
Feng Wang, Yankun Zhao, Ou Yang, Jingbo Cai, Mei Deng. Process safety data management program based on HAZOP analysis and its application to an ethylene oxide/ethylene glycol plant[J]. Journal of Loss Prevention in the Process Industries, 2013(26) :6.
|
[3] |
Jing Wu, Laibin Zhang, Wei Liang, Jinqiu Hu. A novel failure mode analysis model for gathering system based on Multilevel Flow Modeling and HAZOP[J]. Process Safety and Environmental Protection, 2013(91): 1-2.
|
[4] |
S.F. Ávila,F.L.P. Pessoa,J.C.S. Andra-de.Social HAZOP at an Oil Refinery[J].Proc. Safety Prog,2013(32) :1.
|
[5] |
Min An,Yao Chen,Chris J. Baker.A fuzzy reasoning and fuzzy-analytical hierarchy process based approach to the process of railway risk information :A railway risk management system[J]. Information Sciences, 2011, 181(18):3946-3966.
|
[6] |
Nan B.M. Sahar, Syahril Ardi, Suzuki Kazuhiko. HAZOP Analysis Management System with Dynamic Visual Model Aid[J]. American Journal of Applied Sciences, 2010, 7 (7):943.
|
[7] |
Netta Liin Rossing, Morten Lind, Niels Jensen. A functional HAZOP methodology[J]. Computers & Chemical Engineering, 2010 (34).
|
[8] |
中华人民共和国铁道部运输局. 临时限速服务器技术规范:铁运[2012]213 号[S]. 北京:中华人民共和国铁道部运输局,2012.
|
[9] |
何春明,田振武,史增树.临时限速服务器安全通信协议研究[J].铁道通信信号,2011,47(10):50-52. He Chunming, Tian Zhenwu, Shi Zengshu.Temporary speed server secure communication protocol study[J]. Railway Signal & Communication,2011,47(10) :50-52.
|
[10] |
贾玉洁. 浅谈京广高铁临时限速系统[J]. 郑铁科技,2013(4):14-16. Jia Yujie. TSRS on the Beijing-Guangzhou[J]. Zheng Rail Technology,2013(4): 14-16.
|
[11] |
王 喆, 郭艳军. 列车控制仿真测试平台中模拟临时限速服务器研究[J]. 铁路计算机应用,2013,22(3):13-17 . Wang Zhe, Guo Yanjun.Research on simulate TSRS on train control simulation test platform[J]. Railway Computer Application,2013,22(3) :13-17.
|
[12] |
刘栋青.TSRS 间限速命令状态的判定及迁移设计的研究[J]. 铁路通信信号工程技术,2013(10):59-63. Liu Dongqing. Research on TSRS speed command status determination and migration design [J]. Railway Signal & Communication Engineering,2013(10):59-63.
|