基于BIM的铁路验工计价管理系统设计与应用

BIM-based management system for verification and valuation of completed railway works

  • 摘要: 针对铁路工程建设中传统验工计价存在效率低下、协同不畅、数据准确性不足等问题,设计了一套基于BIM(Building Information Modeling)的铁路验工计价管理系统。文章以BIM模型为核心载体,构建项目层、单位工程层、分部工程层及分项工程层四级清单体系,同步建立动态工程量提取机制及工程结构与清单数据链路,实现工程实体数、量、价的一体化管控。整合质量检验批、合同管理、验工计价等核心业务模块,明确验工计价的前置条件与流程标准,有效规避传统模式中的流程漏洞。于新建西宁至成都铁路西宁至黄胜关段(甘青段)开展案例验证,验证结果表明,该系统可显著提升验工计价效率与准确性,降低管理风险,为铁路工程全过程造价管控提供技术支撑。

     

    Abstract: To address the low efficiency, poor collaboration and insufficient data accuracy of the traditional work verification and valuation mode in railway engineering construction, this paper designed a BIM-based management system for railway work verification and valuation. Taking the BIM model as the core carrier, the paper established a four-level list system covering projects, unit works, divisional works and sub-divisional works, and constructed a dynamic engineering quantity extraction mechanism and the correlation framework between engineering structures and list data. It realized the integrated management of attribute information, engineering quantity and cost of engineering entities. The system integrated core business modules including quality inspection lot management, contract management and work verification and valuation, clarified the preconditions and standardized procedures of verification and valuation, and effectively remedied the procedural deficiencies of traditional management modes. This study carried out a case verification on the Xining–Huangshengguan Section (Gansu–Qinghai Section) of the newly built Xining–Chengdu Railway. The results show that the proposed system significantly improves the efficiency and data accuracy of verification and valuation, reduces engineering management risks, and provides reliable technical support for the whole-process cost control of railway engineering projects.

     

/

返回文章
返回