动车组运行途中登顶处置方案研究

Disposal scheme of EMU top-climbing during operation

  • 摘要: 分析研究高铁动车组在运行途中发生需登顶处置的作业流程,提出改进的处置方案。该方案从动车组放电方式、安全信息确认和工具备品准备等方面进行了流程优化。经现场演练验证,优化后的方案在保证随车机械师人身安全的前提下,显著提高了登顶应急处置效率。

     

    Abstract: This article analyzed and studied the process of top-climbing disposal of high-speed railway EMU during operation, and put forward an improved disposal scheme. The scheme optimized the discharge mode of EMU, the confirmation of safety information and the preparation of products. The field drill validates that the optimized scheme significantly improves the efficiency of emergency disposal of top-climbing on the premise of guaranteeing the personal safety of the mechanics on board.

     

/