Transition and switch-over for switch machine in Signaling System modification of existing metro line

  • 摘要: 地铁信号系统改造期间,调试过程中既有系统和新系统对转辙机的控制权需要倒接转化,本文结合北京地铁北京地铁1号线信号系统改造的经验,阐述转辙机控制权转换的原理,为后续既有线地铁改造和其他类似情况提供参考。

     

    Abstract: The control right of switch machine was needed to be switched from existing system to new system during the Signaling System modification of existing metro lines. The theory of control right switch-over of switch machine was expatiated in this article by referring the modification of Beijing Metro Line 1 Signaling System, in an effort to provide reference for following existing metro line modification and other similar cases.

     

/