Abstract:
In response to the problems of weak scheduling management and lack of information technology for production operation organization and command in the current railway depot dispatch room, this paper developed a production command system of dispatching room in centralized mode of train operation depot based on the C/S architecture. The paper took the technical job chart as the core, according to the daily shift plan issued by the dispatching office of the railway group companies, assisted the dispatchers to prepare the stage plan, centralized the arrangement of resources such as station track and shunters of freight station within the jurisdiction of the train operation depot, and centralized the scheduling of operations such as operation and freight. Through using functions such as job progress feedback, real-time uploading of current train information, automatic calculation of trains at the station, real-time statistics of job indicators, and shift handover statistical analysis, the paper uploaded real-time information such as station storage, shunting status, and job progress to the railway bureau dispatch office, provided support for formulating subsequent daily shift plans. The application shows that this system can promote the informatization development of train operation depot production command and improve the management level of train operation depot production command.